Idlewild Tunic
Finished
September 2, 2015
October 9, 2015

Idlewild Tunic

Project info
Idlewild by Julie Hoover
Knitting
SweaterPullover
me
Needles & yarn
US 4 - 3.5 mm
US 5 - 3.75 mm
US 6 - 4.0 mm
US 7 - 4.5 mm
Berroco Blackstone Tweed™
11 skeins = 1430.0 yards (1307.6 meters), 550 grams
Green
gift from Ira
Notes

I finally started this. The yarn was a gift from Ira’s stash. I will always remember Ira for his bear hugs and his passion for knitting.
I came across this pattern last year and think it will look perfect in the yarn. I have been itching to start on this and finally cast it on. I am working both pieces at the same time as that is my preferred method for making two identical pieces. I will need to get a longer cable before starting on the sleeves.
As my gauge is a little smaller (18 sts over 4 inches on a US #7), I decided on the 4th size until I get to the waist shaping, then I will work additional decreases every 8th and every 6th row. I am also planning to make this 4” longer (to upper thigh).

A well written pattern with great attention to detail! I love the cable pattern and I am thinking to use it on a cowl if I have yarn left or leggings.

I must say that I am not too crazy about the yarn while knitting this. It feels harsh on my hands and at times I feel as if I am knitting a carpet… I am hoping that the tunic will soften after the first wash.

2 weeks in and I am starting on the underarm shaping (remember, I am making both pieces at the same time and I am making this 4” longer! :)

3 weeks in and I just cast on all stitches for the arms.
This is how I did the underarm shaping:
Every RS row for the next 11 RS rows: k1, M1R, work to last stitch M1L, k1 (22 sts increased)
Then continue with increases on every RS row, but ALSO do increases on every WS row in this way: P1, M1R (purl-wise), work to last stitch M1L (purl-wise), P1.
For a total of 10 rows (20 sts increased).
When casting on for the sleeves I used the knitted cast on method for a neater look and smoother edge for sewing later (see picture).
When it said “Inv-R, Inv-L”, I M1R and M1L as I did not know what it meant. I looked it up on youtube since and switched to the increase as written in the pattern for the second and third increases for the cuff. Here is a link I like best: lifted increases

Week 4: I have the back and front on separate needles now and will be doing the shoulder shaping/ short rows next. I will be using the German short row method: German short rows I am using the numbers for the smallest neck opening.
If ever you want to substitute German short rows for W&T this is a good video to watch: how to substitute German short rows

Finishing: Kitchener Stitch confession: This is the first time that I did not first have to look up how to do the kitchener stitch grafting. Yeah, I think I finally got it!!! Definitely a lot of practice on this project.
All of the finishing techniques are well thought through and give the piece the appearance of a seamless knit.

I am worried about the strength of the yarn as it broke TWICE during seaming!

I picked up 120 sts for the neck and did 1” on the needle 2 sizes smaller (US#5) and another 1/2” on a needle 3 sizes smaller (US#4) as I don’t like big neck openings especially on a sweater which is otherwise warm.

I love the tubular bind-off and got the perfect neckline. I was however very stressed that my yarn would break (again) during the kitchener stitch as it had before during seaming. I think the yarn weakens as it rubs against itself..I will have to watch out how it wears. BTW I made a little video on how I separated the stitches!

For the cuffs I picked up 34 stitches and did five rows on US#6 and another four rows on US#5’s., then the tubular bind off.

viewed 422 times | helped 8 people
Finished
September 2, 2015
October 9, 2015
About this pattern
35 projects, in 397 queues
Strickliese's overall rating
Strickliese's clarity rating
Strickliese's difficulty rating
About this yarn
by Berroco
Aran
65% Wool, 25% Mohair, 10% Angora
130 yards / 50 grams

5311 projects

stashed 3947 times

Strickliese's star rating
  • Originally queued: August 29, 2014
  • Project created: September 2, 2015
  • Finished: October 9, 2015
  • Updated: January 8, 2022
  • Progress updates: 6 updates