Tartan crocheted knitting bag
Finished
October 12, 2009
May 30, 2011

Tartan crocheted knitting bag

Project info
Made up as I went along
Crochet
Myself
Hooks & yarn
3.5 mm (E)
5.0 mm (H)
3.0 mm
British Breeds Blue Faced Leicester DK
Purple
baa ram ewe-LEEDS in Chapel Allerton, Leeds
British Breeds Blue Faced Leicester DK
Blue
baa ram ewe-LEEDS in Chapel Allerton, Leeds
British Breeds Blue Faced Leicester DK
Green
baa ram ewe-LEEDS in Chapel Allerton, Leeds
British Breeds Blue Faced Leicester DK
Natural/Undyed
baa ram ewe-LEEDS in Chapel Allerton, Leeds
Notes

Mesh = 3mm hook
Chains = 3.5mm hook
Dc edging = 3mm hook
Top cover = 5mm hook

Made the tartan fabric by crocheting a treble mesh (UK stitch names) in stripes, then crocheting chains and threading them though the spaces, then attaching them at both ends.

To cover the wooden frame of an old knitting bag that Désirée gave me. The original fabric was very scruffy.

Cast on 83 stitches for the main bit. Created gussets for the side then dc around all edges.

Sewed navy blue ribbon inside the main body to provide some support. Took ages using split blue wool to blanket stitch the ribbon to the crochet.

Wanted whole thing to be removable so sewed on purple buttons and crocheted button holes for top edge and for straps to hold it under the supports at the bottom.

Made top that buttons on to the main body - ridged chevron stitch from p. 30 in Harmony Guide vol. 6. 5mm hook. dc edging into back loop only.

Straps under base - 3mm hook, blue. CO using dcco length required to go under bag. ch 1, dc in base of next 2dc, 4dcco, miss 4 dc, dc into base of dc across to last 6 dc, 4 dcco, miss 4 dc, dc into base of next 2 dc, make curve over top with extra stitches then dc back along both sides. Fasten off.

viewed 18 times | helped 1 person
Finished
October 12, 2009
May 30, 2011
About this pattern
Personal pattern (not in Ravelry)
About this yarn
by British Breeds
DK
100% Bluefaced Leicester
122 yards / 50 grams

159 projects

stashed 91 times

clareg's star rating
  • Project created: April 21, 2012
  • Finished: April 21, 2012
  • Updated: May 16, 2012