c's penguin bag
Finished
May 31, 2009
July 14, 2009

c's penguin bag

Project info
Buddy bags {includes 7 variations!} by annypurls
Knitting
BagBackpack
Needles & yarn
US 5 - 3.75 mm
265 yards = 1.28 skeins
Lion Brand Cotton-Ease 50/50
207 yards in stash
1 skein = 207.0 yards (189.3 meters), 100 grams
Blue
Lion Brand Cotton-Ease 50/50
149 yards in stash
0.28 skeins = 58.0 yards (53.0 meters), 28 grams
Blue
PS Yarns in New York City, New York
Notes

20090714- finally sewed in the lining. will declare this done. may upload more photos if i can get cute ones.
20090616- the penguin doesn’t look like a penguin (fingerpuppet). will try version #2 tomorrow. :(
still need to line and sew the shoulder part of the ribbon. and finish the iceberg.
20090611- 97% boundoff. finished. washed. forgot iceberg. need to line. bought ribbon b/c i’m just NOT making icord. need to make finger puppet.
20090610- why am i just ignoring this. must be done before i do laundry. on 3rd row after picot now. two more then bind off, make iceberg, sew up, wash.
20090601- gave up on jogless stripes. will be in back. need to find nice way to hide ick. have lining. tension is approx 18.5st over 4 inches. still unsure about light as MC but we’ll see.
20090531- Finally bought pattern and CO. Worried about using lighter colour (Candy Blue) as MC instead of CC, but we’ll see. Will PU and add more Blueberry if necessary. Love the fabric I’m knitting with 3.75mm

viewed 64 times
Finished
May 31, 2009
July 14, 2009
 
About this pattern
377 projects, in 568 queues
penny's overall rating
penny's clarity rating
penny's difficulty rating
About this yarn
by Lion Brand
Aran
50% Cotton, 50% Acrylic
207 yards / 100 grams

42540 projects

stashed 18830 times

penny's star rating
  • Project created: May 31, 2009
  • Finished: July 14, 2009
  • Updated: May 13, 2020