Experimenting w/ 60 st on US1 (graftons).
Superwash 70% Merino Wool 30% SeaCell
3 May - reducing gusset stitches on first sock.
17 May - huge gap in progress due to job intensities. Reactivating now! Gusset finished; on the foot.
14 June - cast on 2nd sock yesterday for WWKiP day. :)
3 July - after huge gap filled with work, am back on track! halfway down foot of second sock.
4 July - grafted second toe - socks match! Now just stitching down the picot edges.
5 july - finished!
I washed these socks in Eucalan and dried them flat, then tucked them away for special gifting. They are quite pretty, and the feel of the knitted yarn is soft and cool, the way silk feels cool.
September 2009
These socks are going to Portugal!