HUEG
Finished
September 27, 2016
November 2, 2016

HUEG

Project info
Rowe by Michele Wang
Knitting
Coat / Jacket
Needles & yarn
US 6 - 4.0 mm
Cascade Yarns ® Ecological Wool®
478 yards in stash
4.1 skeins = 1959.8 yards (1792.0 meters), 1025 grams
Natural/Undyed
Happy Knits in Portland, Oregon
April 9, 2016
Notes

Post up! http://radcraftingcollective.com/fo-friday-rowe/

09-06-2016

Seriously wtf is up with my row gauge?

Pattern gauge:
Double moss stitch, post blocking: 19stx30row = 4x4”
32 st panel Chart A or C, post blocking: 32stx30row = 5x4”

My gauge:
Double moss stitch, post blocking: 20stx20row = 4x4”
32 st panel Chart A, post blocking: 32stx20row = 5x4”

Team MyRowGaugeIsStupid reporting for duty.


Swatched again with US6 and it’s near perfect. 18.5x32 on double moss. It was perfect pre-blocking, funny enough. Just means I won’t necessarily have to block a ton. woo.

09-25-2016

Exciting Saturday night / Sunday morning of swatching complete.

US6 is going to be my going forward needle. My gauge with US6 turned out to be ~17x28 on moss, ~27x30 on cables.

Math will have to be done, but the row gauge is much better and so it’s just a choice of sizing to make up for the difference on stitch gauge.

9-27-2016

Did the tubular cast on at the end of the workday. Literally only got the first 4 setup rows done, it was different from my normal tubular but it looks nice. Wouldn’t do it again on another project, but it was good.

10-03-2016

Finished the Right Front today.

On hold until Lilli Pilli is done :)

Total days worked: 4

10-10-2016

Picked up again after lunch.

Total days worked: 4.5

10-11-2016

Finished the first skein today. Ended on row 34 of the 3rd pattern repeat on the left front. 40 more rows and left front will join the finished right front.

Total time worked: 40 hours.

10-12-2016

Total time worked: 41 hrs - both fronts done.

10-14-2016

Total time worked: 51 hours.

2/3 done with the sleeve increases. They are 17” long.

10-20-2016

Total time worked: 55.5 hours.

Sleeve increases done. Started cap shaping on left sleeve.

10-24-2016

Total time worked: 61 hours

10 rows left of ribbing and then it’s cabletime on the back. Whee.

10-28-2016

Total time worked: 75 hours

Back piece done.

11-02-2016

Total time worked: 88.5 hours

EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

I AM NEVER TAKING THIS OFF.

viewed 543 times | helped 6 people
Finished
September 27, 2016
November 2, 2016
 
About this pattern
516 projects, in 2410 queues
starcastic's overall rating
starcastic's clarity rating
starcastic's difficulty rating
About this yarn
by Cascade Yarns ®
Bulky
100% Wool
478 yards / 250 grams

34338 projects

stashed 14134 times

starcastic's star rating
  • Originally queued: March 3, 2016
  • Project created: September 6, 2016
  • Finished: November 2, 2016
  • Updated: November 18, 2016